From the shell to the last socket: SeBa Bauträger GmbH coordinates all trades for interior and exterior finishing, so that you take over a building ready to move into – without having to manage dozens of craftsmen yourself.
Overview
What does “turnkey” mean in concrete terms?
Turnkey construction means that SeBa Bauträger GmbH completes not only the shell but the entire building until it is ready to move into: electrical and plumbing installation, heating technology, screed, interior plaster, tiles, doors and the final cleaning. You receive a house you can move into straight away – without the client having to coordinate electricians, tilers and painters themselves.
This option is particularly suitable for clients who value planning certainty and a clear fixed price. The scope of services is recorded in a detailed building specification and specification of works, so that it is clear from the outset which fittings are included.
One contact person
Instead of chasing ten trades on the phone, there is one central contact person at SeBa – for questions, arrangements and an overview of the entire construction process.
What turnkey finishing can include
Electrical, plumbing and heating installation according to current technical standards
Interior plaster, screed and floor coverings according to the agreed list of fittings
Windows, interior doors, stairs and sanitary fixtures
Facade, roofing and outdoor facilities by arrangement
Coordination and supervision of all subcontractors involved
Final cleaning and joint acceptance before moving in
The standard of fittings – from sanitary ceramics to floor coverings – is defined together with the client and documented in the specification of works. This allows the fixed price to be calculated reliably from the outset and avoids later discussions about the agreed scope.
Process of turnkey finishing
1
Define the fittings
Joint selection of the sanitary, flooring and fittings standard based on the specification of works.
2
Fixed-price quotation
Binding costing based on the agreed fittings and schedule.
3
Interior and exterior finishing
Coordinated execution of all trades until the building is completely ready to move into.
4
Acceptance & handover
Joint inspection, protocol and handover of the keys – ready to move in.
The actual scope of fittings is determined solely by the individually agreed building specification and specification of works. Deviations from sample images or reference projects in terms of colour or make are possible within customary commercial tolerances.
Questions about the fixed price?
A short conversation clarifies which standard of fittings suits your budget.
The fixed price includes all trades and details of fittings listed in the building specification and specification of works. This description is discussed together before the contract is concluded, so that both sides know exactly what is owed at what price.
Services outside this description, such as special requests, are calculated separately as additional services and confirmed in writing.
Yes. Tiles, sanitary fixtures, floor coverings and many other details are selected together within the agreed standard packages. Higher-quality fittings can be taken into account for a corresponding surcharge.
As SeBa Bauträger GmbH coordinates all trades, managing delays by individual subcontractors is our responsibility. The client is informed promptly of any significant deviations from the schedule.
Payment is made in instalments according to actual construction progress, as set out in the payment schedule of the construction contract. For consumer contracts, the statutory requirements regarding the amount and due date of instalment payments apply.
The statutory warranty provisions of construction contract law apply to all services provided. If a defect becomes apparent after acceptance, SeBa Bauträger GmbH is first given the opportunity to remedy it within a reasonable period.
During the final acceptance, the completed building is inspected jointly and its condition is recorded in an acceptance protocol. Minor outstanding work is noted there and completed within a reasonable period.
Certain trades, such as painting or outdoor facilities, can be carried out as your own work by arrangement. These areas are then deducted from the fixed price and documented accordingly in the contract.
The duration depends on the scope of the fittings, the availability of materials and the trades involved. A realistic schedule is defined together with the fixed-price quotation and documented in the construction contract.
Special requests that arise during the construction phase are checked for feasibility, additional costs and impact on the schedule and only carried out after written confirmation. This keeps the fixed price reliable for the originally agreed scope.
That depends on the client's manual skills, available time and desired budget. In a personal meeting, we can assess which combination of turnkey finishing and your own work makes sense.
Would you like to discuss turnkey finishing?
A short conversation is enough to start with – together, we can clarify which standard of fittings suits your project.
The images of people and everyday situations used on this website are AI-generated. They were generated before 2 August 2026.
Consumer dispute resolution
We are neither willing nor obliged to participate in dispute resolution proceedings before a consumer arbitration board.
Privacy
Information on the processing of personal data · Last updated: 22/09/2026
This translation is provided for information purposes only. In the event of any discrepancy, the German version shall prevail.
1. Controller
SeBa Bauträger GmbH Königstraße 43a 32547 Bad Oeynhausen Email: info@seba-bautraeger.com Phone: +49 (0) 5731 - 868 90 64
2. Visiting the website
When this website is accessed, the hosting provider may process technically necessary connection data, such as the IP address, time of access and requested files. This processing serves the secure and stable operation of the website and is based on legitimate interests (Art. 6(1)(f) GDPR).
3. Cookies and similar technologies
This website does not use cookies for analysis, marketing or tracking purposes. No third-party services are integrated that would set cookies or similar technologies on your device. Consent pursuant to Section 25 TTDSG is therefore not required for the operation of this website.
4. Fonts
The fonts used on this website are embedded locally in the project. No connection is established to Google Fonts or comparable external font services to display the fonts.
5. Contact form
The data entered in the contact form is used exclusively to process the respective enquiry and is transmitted by email to the responsible mailbox. The legal basis is Art. 6(1)(b) GDPR if the enquiry is aimed at initiating a contract, otherwise Art. 6(1)(f) GDPR. The maths question in the form serves solely to protect against automated spam and is not evaluated.
The details you enter are processed, in particular your first and last name, email address, optionally your phone number and, for enquiries as a company, additionally the company name and address. Voluntarily uploaded images (max. 4 files in jpg, jpeg or png format) are transmitted exclusively as an attachment to your enquiry by email and are not stored permanently on the web server. Please only upload images for which you hold the necessary rights and on which no persons are recognisable whose consent has not been obtained. If you request a copy of your message, it is additionally sent to the email address you provided.
6. Contact by phone, email or WhatsApp
If you contact us by email, phone or WhatsApp, your details are processed to handle your enquiry and for any follow-up questions. The legal basis depends on the respective reason for contacting us and the relevant provisions of the GDPR. When contacting us via WhatsApp, the privacy policy of WhatsApp Ireland Limited also applies.
7. External links
This website contains links to external services that open in a new window when clicked. These are pure links; no content from these services is embedded in the website and no data is automatically transmitted to the respective providers before you click. As soon as you follow a link, the privacy policy of the respective provider applies:
Google Maps – Google Ireland Limited, Gordon House, Barrow Street, Dublin 4, Ireland
Personal data is deleted as soon as it is no longer required for the purpose of its processing, unless statutory retention obligations prevent this.
9. Your rights
Subject to the statutory requirements, you have the right to access, rectification, erasure, restriction of processing, data portability and – where the requirements are met – to object to certain processing. Where processing is based on consent, you can withdraw it at any time with effect for the future. You also have the right to lodge a complaint with a data protection supervisory authority, for example the State Commissioner for Data Protection and Freedom of Information of North Rhine-Westphalia.
10. Updates
This privacy policy is adapted as required to changes in the technical functions of the website and to the specific data processing.
Terms and Conditions
SeBa Bauträger GmbH – New construction, turnkey construction and renovation · Last updated: 22/09/2026
This translation is provided for information purposes only. In the event of any discrepancy, the German version shall prevail.
1. Scope
These General Terms and Conditions apply to all contracts between SeBa Bauträger GmbH, Königstraße 43a, 32547 Bad Oeynhausen, hereinafter referred to as SeBa, and its clients for the provision of services in the field of new construction, turnkey construction and renovation.
These Terms and Conditions apply to contracts with consumers as well as with entrepreneurs, unless otherwise agreed in the respective construction contract.
The client within the meaning of these Terms and Conditions is the person or company that concludes a contract with SeBa for the construction services offered.
Deviating, conflicting or supplementary general terms and conditions of the client do not become part of the contract unless SeBa expressly agrees to their validity in writing.
Mandatory statutory provisions, in particular the construction contract law of Sections 650a et seq. of the German Civil Code (BGB), remain unaffected by these Terms and Conditions.
2. Conclusion of contract
A construction contract is concluded by a written order confirmation or by both parties signing a construction or work contract between SeBa and the client.
The services, reference images and descriptions presented on the website serve as general information about the range of services offered by SeBa Bauträger GmbH. They do not constitute a binding offer to conclude an individual construction contract.
Unless expressly marked as binding, cost estimates and quotations are subject to change and non-binding until a written order confirmation has been issued.
SeBa is entitled to decline enquiries if the requested services cannot be offered due to a lack of capacity or for technical, legal or building regulation reasons.
3. Range of services
SeBa offers services in the fields of new construction, turnkey construction and renovation. Depending on the individual agreement, the following services in particular may be provided:
Planning and consulting for new construction and refurbishment projects
Preparation and submission of the documents required for the building permit
Shell construction work and erection of new buildings
Turnkey interior and exterior finishing
Coordination of the trades and subcontractors involved
Energy-efficient refurbishment and modernisation of existing buildings
Conversion, extension and renovation work
Demolition and deconstruction work, including disposal and removal of construction waste
Site management and construction supervision
Other comparable services, insofar as they are individually agreed and legally permissible
Which services are actually provided depends on the individual specification of works or building specification for the respective contract. Not every service presented on the website is automatically part of every construction project.
4. Specification of works and building specification
The specific scope of services of a construction project is recorded in an individual specification of works or building specification, which becomes part of the respective contract.
The general descriptions on the website do not replace an individual building specification or specification of works. The description agreed in the individual case is solely decisive for scope, fittings and standard of execution.
Services not expressly included in the specification of works are generally not owed and can be commissioned separately as additional services.
5. Planning and building permit
Where agreed, SeBa assists in preparing and submitting the documents required for the building permit to the responsible building authority.
The granting of a building permit lies within the competence of the respective authority and outside SeBa's sphere of influence. Processing times and official requirements may affect the agreed schedule.
If the start of construction is delayed due to official proceedings, the agreed schedule is postponed accordingly without giving rise to any claims against SeBa, unless SeBa is responsible for the delay.
6. Prices and cost estimate
Unless a fixed price has been expressly agreed, cost information is based on a calculation at the time the quotation was prepared and is subject to the actual determination of quantities and volumes after completion of planning.
For turnkey construction projects, a fixed price is generally agreed on the basis of the agreed specification of works and building specification. Changes to the scope of services may lead to an adjustment of the price.
Unless otherwise stated, all prices are subject to statutory VAT.
7. Payment schedule and instalment payments
Payment is made according to a payment schedule set out in the contract, which is based on actual construction progress. Instalment invoices are issued after completion of the respective construction phase.
For contracts with consumers for the construction of a building, the statutory requirements regarding the amount and due date of instalment payments, in particular pursuant to Section 650m BGB, are observed.
Unless otherwise agreed, invoice amounts are due for payment without deduction within 14 days of receipt of the invoice.
In the event of late payment, SeBa is entitled, after prior notice, to suspend construction work until the amounts due have been paid, insofar as the delay is significant.
8. Construction time and deadlines
The schedule for the start of construction, construction phases and completion is agreed individually before the contract is concluded and recorded in the construction contract.
Delays due to weather conditions, official proceedings, supply shortages of building materials, force majeure or circumstances for which the client is responsible extend the agreed deadlines accordingly, without SeBa being held responsible for this.
SeBa informs the client of foreseeable delays as early as possible and works towards an appropriate adjustment of the schedule.
9. Client's obligations to cooperate
The client provides the documents, access and decisions required for construction in good time, in particular land register extracts, powers of attorney, connection permits and decisions on details of fittings.
If construction is delayed due to missing or late cooperation by the client, the schedule is extended accordingly; any additional costs incurred as a result may be charged to the client.
10. Change requests and additional services
Change requests by the client that go beyond the agreed specification of works are checked before execution with regard to technical feasibility, additional costs and effects on the schedule.
Additional services are only carried out after written confirmation by both contracting parties. Without this confirmation, there is no entitlement to the execution of the additional service.
For reasons of verifiability, verbal agreements on the construction site should be confirmed in writing promptly.
11. Materials and standard of execution
The materials used and the standard of execution are based on the agreed specification of works. Unless a specific make has been agreed, SeBa selects commercially available materials of comparable quality.
Deviations from sample images, reference images or example projects presented on the website with regard to colour, structure or grain are possible within customary commercial tolerances and do not constitute a defect.
12. Site set-up and access
The client ensures that the construction site is accessible for the agreed construction work, in particular with regard to access roads, construction power and construction water connection, unless otherwise stipulated in the contract.
SeBa is entitled to set up facilities required for construction, such as site fencing, scaffolding or containers, on the building plot and to remove them again after completion of construction.
13. Acceptance
After completion of the agreed construction phase or the entire construction project, the client carries out a formal acceptance, during which the condition of the structure is jointly inspected and recorded in a protocol.
Minor defects that do not significantly impair the use of the structure do not entitle the client to refuse acceptance; they are recorded in the acceptance protocol and remedied within a reasonable period.
If the client puts the completed work into use without formally declaring acceptance or communicating justified reasons for refusal, the statutory provisions on tacit acceptance apply.
14. Warranty and claims for defects
The statutory warranty provisions apply to defects in the construction work performed, in particular the provisions of construction contract law pursuant to Sections 633 et seq. BGB.
If a defect becomes apparent after acceptance, SeBa must first be given the opportunity to remedy it within a reasonable period before further rights in respect of defects are asserted.
The warranty period is governed by the statutory provisions and begins with the acceptance of the respective work.
15. Retention of title
Materials supplied and installed by SeBa remain the property of SeBa until the respective invoice has been paid in full, insofar as this is legally permissible and not precluded by installation into the property.
16. Insurance and transfer of risk
Until acceptance, SeBa bears the risk of accidental deterioration or destruction of the work, unless otherwise provided by law. Upon acceptance, the risk passes to the client.
SeBa maintains the insurance customary for construction work, in particular business liability insurance.
17. Liability
SeBa is liable in accordance with the statutory provisions for damage caused intentionally or through gross negligence, as well as for damage resulting from injury to life, body or health.
For damage resulting from the slightly negligent breach of material contractual obligations, SeBa's liability is limited in amount to the damage typically foreseeable under the contract, insofar as legally permissible.
A further limitation of liability does not apply insofar as mandatory statutory liability provisions conflict with it, in particular under the German Product Liability Act.
18. Force majeure and exceptional events
If a service cannot be provided temporarily due to exceptional circumstances for which SeBa is not responsible, the statutory provisions apply.
This may include in particular extreme weather conditions, official orders, significant supply shortages of building materials or comparable events. SeBa informs the client of foreseeable effects as early as possible.
19. Termination and withdrawal
The right of both contracting parties to extraordinary termination for good cause as well as the statutory termination rights pursuant to Sections 648 and 648a BGB remain unaffected.
If the client terminates without good cause, SeBa retains the right to the agreed remuneration less saved expenses, unless otherwise provided by law.
For reasons of verifiability, termination should be made in text form.
20. Right of withdrawal for consumer contracts
Insofar as a contract with a consumer is concluded under the statutory requirements as a distance contract or an off-premises contract, statutory rights of withdrawal may exist.
Insofar as a statutory right of withdrawal exists, the client will be informed of this separately and in the form prescribed by law. The statutory provisions on the start, duration, exercise and possible exclusions of the right of withdrawal remain unaffected.
21. Complaints and feedback
SeBa values open and solution-oriented communication. Complaints, requests or comments on construction work can be addressed directly to SeBa and are reviewed as promptly as possible.
22. Data protection
Personal data is processed within the framework of the applicable statutory data protection provisions. Further information can be found in the separate privacy policy of SeBa Bauträger GmbH.
23. Applicable law
The contractual relationship is governed by the law of the Federal Republic of Germany, unless mandatory statutory consumer protection provisions conflict with this. The United Nations Convention on Contracts for the International Sale of Goods does not apply.
24. Place of jurisdiction
For consumers, the statutory rules on place of jurisdiction apply. With entrepreneurs, SeBa's registered office may be agreed as the place of jurisdiction, insofar as legally permissible.
25. Severability clause
Should any provision of these General Terms and Conditions be or become invalid in whole or in part, the remaining provisions shall remain unaffected. The invalid provision shall be replaced by the statutory provisions.
26. Provider
SeBa Bauträger GmbH Königstraße 43a 32547 Bad Oeynhausen Germany