SeBa Bauträger GmbH
Get in touch WhatsApp
+49 (0) 5731 - 868 90 64 info@seba-bautraeger.com Königstraße 43a, 32547 Bad Oeynhausen

Services

Demolition work in Bad Oeynhausen

Clearing the way for your next construction project.

Whether partial demolition, stripping out or complete deconstruction: SeBa Bauträger GmbH carries out demolition work professionally, safely and to a fixed schedule – as a stand-alone service or as the first step before new construction and refurbishment.

Demolition work on an existing building

Overview

Who benefits from professional demolition work?

Demolition work is always required when a building or part of a building has to make way for a new project – be it the complete demolition of a dilapidated existing building before a new build, stripping out individual storeys before a refurbishment or the deconstruction of extensions, garages and outbuildings. The removal of construction waste and its proper disposal are also part of the service.

SeBa Bauträger GmbH carries out demolition work both as a stand-alone contract and directly following the planning phase of a new construction or renovation project. This creates a seamless transition between deconstruction and reconstruction, without friction losses between different companies.

Safe & controlled

Demolition is precision work: structural stability, neighbouring properties and utility lines are checked in advance so that the deconstruction proceeds in a controlled manner and without surprises.

What demolition work can include

  • Survey of existing conditions, investigation of hazardous substances and structural check before demolition starts
  • Stripping out individual rooms, storeys or parts of buildings
  • Partial demolition of extensions, garages, sheds and outbuildings
  • Complete deconstruction of residential and commercial buildings
  • Professional separation, removal and disposal of construction waste
  • Securing the excavation pit and handover for the follow-on trade
Deconstruction work in detail

Every demolition is preceded by a careful inspection: which components are load-bearing, which utility lines must be disconnected in advance, are there indications of hazardous substances such as asbestos? Only once these questions have been clarified does the actual deconstruction begin – in a controlled manner, in stages and with the construction site continuously secured.

Process of a demolition project

1

Survey of existing conditions

On-site inspection, checking of structural stability, utility lines and possible hazardous substances in the building.

2

Permit & planning

Clarification of the legal requirements for demolition and preparation of a binding time and cost plan.

3

Deconstruction

Controlled demolition or stripping out, continuous protection of the construction site and neighbouring properties.

4

Disposal & handover

Removal and professional disposal, handover of the cleared area for the next trade.

Depending on scope and location, demolition work is subject to special building and waste regulations, for example regarding the investigation of hazardous substances or the disposal of construction waste. The specific process is checked individually before work begins and recorded in the specification of works.

Questions about your deconstruction project?

An on-site appointment clarifies the scope of demolition your project requires.

Get in touch

Frequently asked questions

Questions about demolition work

Whether a demolition permit is required depends on the size, location and type of building. For smaller outbuildings, notifying the building authority is sometimes sufficient; for larger buildings, a formal procedure is usually necessary.

SeBa Bauträger GmbH checks the specific situation on site and assists with submitting the required documents.

Before demolition begins, a survey is carried out in which the year of construction, materials used and visible indications of hazardous substances are checked. If there is any suspicion, a professional investigation is commissioned before the actual demolition work begins.

The duration depends on the size, construction method and any contamination of the building. A garage can often be deconstructed within a few days, while a complete residential building can take several weeks. A realistic schedule is drawn up after the survey.

The construction waste is separated by type of material, removed and taken to the permitted disposal or recycling routes. Proper disposal is an integral part of the agreed service.

Yes, partial demolition of individual extensions, storeys or parts of buildings is generally possible. Particular care is required with regard to the structural stability of the remaining part of the building, which is checked as part of the planning.

Dust protection measures, construction fences and careful scheduling are part of the usual procedure. Noisy work is bundled wherever possible and, where necessary, announced to the neighbours in advance.

Yes, that is a common case. After deconstruction, planning for the new build can follow seamlessly, so that the excavation and site development are prepared directly after demolition. You can find details in the new construction service area.

The basis is the individual specification of works, which takes into account the scope, the volume of waste to be disposed of and special requirements such as the remediation of hazardous substances. On this basis, a detailed quotation is prepared and discussed before the contract is concluded.

Before demolition work begins, all service connections must be professionally disconnected. Coordination with the responsible utility companies is taken into account in the planning and agreed with the client.

Would you like to discuss your demolition project?

An on-site appointment is enough to start with – together, we can clarify what your building needs.

Get in touch